PWM switch: Bug fixed + some improvements
- Serious bug: Switch did not go below 90% duty cycle (left-over from testing code). Could result in overcharging of battery. - Improvement: Preventing very short on/off times (duty cycles close to 0 or 1) as switching time is quite slow - PWM frequency now configurable via PCB config (and increased from 20 to 25 Hz) - Some unused parameters in PwmSwitch struct removed and variables renamed - Overcurrent setting now via solar_bus
This commit is contained in:
+8
-3
@@ -117,7 +117,7 @@ int main()
|
||||
#else // MPPT
|
||||
dcdc_init(&dcdc);
|
||||
half_bridge_init(PWM_FREQUENCY, PWM_DEADTIME, 12 / dcdc.hs_voltage_max, 0.97); // lower duty limit might have to be adjusted dynamically depending on LS voltage
|
||||
#endif
|
||||
#endif
|
||||
|
||||
// Configuration from EEPROM
|
||||
data_objects_read_eeprom();
|
||||
@@ -145,6 +145,10 @@ int main()
|
||||
uext_init();
|
||||
init_watchdog(10); // 10s should be enough for communication ports
|
||||
|
||||
#ifdef CHARGER_TYPE_PWM
|
||||
dc_bus_init_solar(&hv_bus, PWM_CURRENT_MAX);
|
||||
bat_bus = &lv_bus;
|
||||
#else
|
||||
// Setup of DC/DC power stage
|
||||
switch(dcdc.mode) {
|
||||
case MODE_NANOGRID:
|
||||
@@ -152,14 +156,15 @@ int main()
|
||||
bat_bus = &lv_bus;
|
||||
break;
|
||||
case MODE_MPPT_BUCK: // typical MPPT charge controller operation
|
||||
dc_bus_init_solar(&hv_bus);
|
||||
dc_bus_init_solar(&hv_bus, DCDC_CURRENT_MAX);
|
||||
bat_bus = &lv_bus;
|
||||
break;
|
||||
case MODE_MPPT_BOOST: // for charging of e-bike battery via solar panel
|
||||
dc_bus_init_solar(&lv_bus);
|
||||
dc_bus_init_solar(&lv_bus, DCDC_CURRENT_MAX);
|
||||
bat_bus = &hv_bus;
|
||||
break;
|
||||
}
|
||||
#endif
|
||||
charger_detect_num_batteries(&charger, &bat_conf, bat_bus); // check if we have 24V instead of 12V system
|
||||
battery_init_dc_bus(bat_bus, &bat_conf, charger.num_batteries);
|
||||
|
||||
|
||||
Reference in New Issue
Block a user