DC/DC start duty cycle adjusted to reduce stress

Previously, the DC/DC started at 90% of the solar panel OCV to be closer to the MPP (at around 80% of OCV). This creates stress on the MOSFETs due to high inrush currents. In addtion to that, a high power panel might not be derated fast enough, which caused issues in the 12V/10A charge controller connected to a 280W panel. This commit improves the situation and starts the MPPT slightly below the measured solar voltage with low power.
This commit is contained in:
Martin Jaeger
2019-06-13 11:51:31 +02:00
parent 0e91c834ac
commit 36cccfb63d
+6 -4
View File
@@ -148,16 +148,18 @@ void dcdc_control(dcdc_t *dcdc, dc_bus_t *hs, dc_bus_t *ls)
}
return;
}
debounce_counter = 0;
else {
debounce_counter = 0;
}
if (_dcdc_check_start_conditions(dcdc, ls, hs) && ls->voltage < dcdc->ls_voltage_max) {
// Vmpp at approx. 0.8 * Voc --> take 0.9 as starting point for MPP tracking
half_bridge_start(ls->voltage / (hs->voltage * 0.9));
// Don't start directly at Vmpp (approx. 0.8 * Voc) to prevent high inrush currents and stress on MOSFETs
half_bridge_start(ls->voltage / (hs->voltage - 1.0));
printf("DC/DC buck mode start.\n");
}
else if (_dcdc_check_start_conditions(dcdc, hs, ls) && hs->voltage < dcdc->hs_voltage_max) {
// will automatically start with max. duty (0.97) if connected to a nanogrid not yet started up (zero voltage)
half_bridge_start((ls->voltage * 0.9) / hs->voltage);
half_bridge_start(ls->voltage / (hs->voltage + 1.0));
printf("DC/DC boost mode start.\n");
}
}